Skip to content
Trim Waste Management logo
  • Engineering Services
  • Trim and Label Matrix Cutter
  • System Features
  • System Components
  • Industries Served
  • Contact Us
Request a Quote
Trim Waste Management logo

Trim Waste Management Photo Gallery

Piping being installed in a new plant with the TWM cutters mounted on cutter stands.
Installation utilizing the customers existing silenced pickup chute.  This is where the waste being extracted will enter the pneumatic conveying system.
Installation utilizing the customers existing silenced pickup chute with the large roll of waste being wound up.  This is where the waste being extracted will enter the pneumatic conveying system and do away with the need to roll the waste.
Installation of the customers existing cutters and silencers with 2 conveying lines merging into one cutter.  This is to reduce the number of cutters saving 1,000's of dollars on the installation of the pneumatic trim removal system.
Installation utilizing the customers existing silenced pickup chute.  This is where the waste being extracted will enter the pneumatic conveying system.
(2) material handling fans with conveying lines running to the slant screen separator.
(2) material handling fans with conveying lines running to the slant screen separator.
Main pneumatic conveying lines penetrating the outside wall and running into the material handling fans and out of the fans into the slant screen separator.  There is a large exhaust conveying line which runs to the balance fan where the conveying air is exhausted to atmosphere.
Open view of the trim system after installation in a new facility.
Cutters, silencers and conveying lines during installation inside of a new facility.
Main pneumatic conveying line with silenced orifice.  The silenced orifice is in place of a future trim producing machine.  In the future, the orifice will be removed and the conveying line from the new machine will be tapped into the open line.
system-picture
Piping from the cutters merging into one of two main pneumatic conveying lines.
Arial view of the slant screen separators with support structure designed and installed by Trim Waste Management.
Piping being installed in a new plant with the TWM cutters mounted on cutter stands.
TWM inline cutter mounted on a cutter stand with integrated silencer support.
Slant screen separator mounted on top of a compactor outside of the building.
Installation of customers existing inline cutter/chopper suspended from the ceiling.
Chute from the slant screen separators mounted on the roof to the baler inside the building.
Piping running along the roof from the material handling fans to the slant screen separators.
Arial view of the slant screen separators with support structure designed and installed by Trim Waste Management.
Piping coming from the material handling fans bending up on the roof to the slant screen separators.
2 large slant screen separators mounted back to back on the roof of the building with the chute penetrating the roof and emptying into the baler located inside of the building.
Piping coming from the material handling fans to the slant screen separators.

1 2 ►
  • Engineering Services
  • Trim and Label Matrix Cutter
  • Clients and Customers Served
  • System Features
  • System Components
  • Industries Served
  • About Us
  • Photo Gallery
  • News
  • Contact Us
SiteLock

Email Newsletter

Request a Quote

5874 Rock Hall Rd.
Rock Hall, MD 21661

(410) 675-8500
info@trimwastemanagement.com

© 2025 Trim Waste Management, LLC. All Rights Reserved.

Website by NABWD

Scroll to top
  • About Us
  • Request a Quote
  • Industries Served
  • System Components
  • System Features
  • Engineering Services
  • Trim and Label Matrix Cutter
  • Clients and Customers Served
  • Photo Gallery
  • Contact Us